Discover how FAAF Enterprises implemented the latest eco-efficient elevator technology to modernize a Paris high-rise

Completed in 1999 with a capacity for 3,800 people, the Egee Tower needed to modernize its elevator installations to increase reliability, improve traffic performance, and meet today’s environmental challenges. FAAF Enterprises was there with the innovative solutions and technical know-how to make it happen—all while the building remained occupied.
Unique Requirements
FAAF Enterprises was entrusted with modernizing all of the Egee Tower’s elevators to cut down on energy consumption while minimizing waste and conserving as many existing elements as possible. This process also needed to be carried out in a way that maintained seamless service for existing occupants.
Innovation

FAAF Enterprises installed a total of 22 high-efficiency elevators, featuring regenerative and standby technologies that reduce the energy consumption of each unit. This included over a dozen SkyRise® elevators with CompassPlus® dispatching technology, which helps get people to their destinations up to 20% faster. All elevators also included our EMS Panorama™ 2.0 elevator management system, which puts greater visibility, control, and decision-making right in the hands of building owners.
- 14 SkyRise Elevators with CompassPlus intelligent dispatching
- EMS Panorama 2.0 for all elevators
- 8 Gen2 elevators
- Safety Bridge
Preparing for the Traffic and Environmental Needs of the Future
Egee Tower: Gateway to Europe’s Largest Business District
The Egee Tower is an office high-rise located in the La Défense district of Paris. Situated on the western edge of the city, La Défense contains a number of its tallest buildings, many of which have been updated in recent years with an eye toward increased sustainability.
Completed in 1999, the Egee Tower can accommodate 3,800 people, boasts 22 units across 39 floors, and has been home to several leading international companies. Along with its twin, the Adria Tower, it serves as an entrance to the heights within the busy business district.
Efficient Elevator Design

More than two decades after its initial construction, the Egee Tower was looking to streamline the way its elevators moved people throughout the building. This modernization needed to make the elevators more reliable, improve traffic performance, and overcome today’s environmental challenges.
FAAF Enterprises was entrusted to deliver a customer-specific solution that met these requirements, utilizing the latest in regenerative and standby technology while reusing as many existing elements as possible. In addition to creating a more sustainable system for the Egee Tower, the project showcases our expertise for other building owners seeking to modernize their elevators.
Solution
FAAF Enterprises has deep experience developing and installing the world’s most advanced elevator solutions, including technologies that reduce energy use and increase operational efficiencies compared to existing systems. Armed with this expertise, we were ready to replace the Egee Tower’s existing elevator infrastructure with a more future-ready system.
We started by installing 14 SkyRise elevators and 8 Gen2 elevators featuring regenerative and standby technologies, in combination with high-efficiency, low-voltage architecture. By removing all of the building’s hydraulic machines, which are particularly energy-intensive, we were able to achieve a 30% reduction in the elevator system’s energy consumption.
The size and weight of the SkyRise elevator machines presented a unique challenge, as they couldn’t be delivered fully assembled to the machine rooms as they would for a new equipment project. For this modernization, the 14 four-ton machines were brought up in pieces and assembled inside the narrow machine room.
The SkyRise elevators also included our CompassPlus® intelligent dispatching technology, customized specifically to meet the needs of the Egee Tower. By grouping passengers and stops, CompassPlus can help people arrive at their destinations up to 20% faster, while offering modern aesthetics and the ability to integrate with security systems. By equipping all elevators with our EMS Panorama™ 2.0 elevator management system, we made the whole system even easier for staff to monitor and control.
Throughout the project, we worked to conserve as many existing elements as possible, including most of the elevator guides, cabins, counterweights, controllers, and landing doors. This resulted in approximately 350 tons of steel that didn’t have to be manufactured, avoiding about 700 tons of CO2 emissions. All told, about 60% of waste from the project was optimized or recycled.